This project, the 5th of its kind for AC General, involved the construction of the brand new school “PP” K–8 educational facility totaling 190,000 square feet, along with a 5,000 square foot stand-alone Central Energy Plant (CEP).
Key mechanical features included:
This project, the 4th of its kind for AC General, involved the construction of the brand new school “OO” K–8 educational facility totaling 190,000 square feet, along with a 5,000 square foot stand-alone Central Energy Plant (CEP). The scope included comprehensive mechanical systems designed to support optimal comfort, air quality, and energy efficiency throughout the campus.
Key mechanical features included:
This integrated HVAC solution supports the school’s commitment to sustainability, occupant wellness, and operational efficiency, providing a modern and adaptive learning environment.
The first new St. Johns County high school “HHH” in over 10 years!
This project, the 2nd of its kind for AC General, involved the construction of the brand new school “MM” K–8 educational facility totaling 190,000 square feet, along with a 5,000 square foot stand-alone Central Energy Plant (CEP).
Key mechanical features included:
New two-story classroom building.
Campus-Wide HVAC upgrade; Re-piped entire underground chilled water loop of existing school, built brand new 500-ton cooling capacity CEP, replaced all duct work in 17 buildings and installed 10 new AHU.
Converted existing elementary school into a K-8; new two-story classroom addition, gymnasium and CEP.
This project, the 1st of its kind for AC General, involved the construction of the brand new school “LL” K–8 educational facility totaling 190,000 square feet, along with a 5,000 square foot stand-alone Central Energy Plant (CEP). The scope included comprehensive mechanical systems designed to support optimal comfort, air quality, and energy efficiency throughout the campus.
Key mechanical features included:
This integrated HVAC solution supports the school’s commitment to sustainability, occupant wellness, and operational efficiency, providing a modern and adaptive learning environment.
Brand new St. Johns County elementary school “M” completed in time for 2017-18 academic year
Orange Park, FL; Cafeteria Expansion completed in summer 2013; re-pipe of underground chilled and heating hot water system completed in fall of 2018
Totaling 234,490 square feet, the HVAC system was designed to support year-round comfort and energy efficiency, anchored by the installation of (2) 400-ton chillers providing central chilled water capacity.
The air distribution system featured over 230,000 pounds of sheet metal ductwork, (22) Air Handling Units (AHUs), collectively delivering 195,000 CFM of conditioned air throughout the building. To support precise zone control and occupant comfort, the system included (170) Variable Air Volume (VAV) boxes, each integrated with digital controls.
Additionally, the project involved the installation of almost 6,000 linear feet of carbon steel chilled water piping, ensuring efficient hydronic distribution across multiple floors and mechanical zones.
This project demonstrates a complex and large-scale HVAC installation, integrating substantial mechanical infrastructure with advanced controls to meet the demands of a modern, energy-efficient facility.
This project, the 3rd of its kind for AC General, involved the construction of the brand new school “NN” K–8 educational facility totaling 190,000 square feet, along with a 5,000 square foot stand-alone Central Energy Plant (CEP).
Key mechanical features included:
“III” high school was nearly identical to Tocoi Creek High School. The second high school we have completed in as many years, this one serves the Beachside Community.
Scope included over 250 water-source heat pumps, two rooftop cooling towers, two rooftop energy recovery ventilators, two self contained water-cooled units, boiler, heat-exchanger, five split-coupled vertical in-line pumps, VFDs, multiple exhaust fans and VAVs, eight floors plus roof of sheet metal duct work and hydronic piping.
Installation of new chiller, pumps, air handling units, piping and sheet metal duct work
Dining Room expansion project
Greenfield industrial beef and pork processing; installed primary anhydrous ammonia system and secondary glycol refrigerant system including 52 evaporators.
Expansion of industrial refrigeration system
Hilliard Middle-Senior High School expansion complete in 2015, Yulee Middle School addition completed in 2012
Jacksonville, FL; Design-Build of HVAC system for Duval County Public School completed in 2009
Cafeteria Expansion
Installation included nine packaged Rooftop AC units, six Heat Pump Split System DX AC Units and sheet metal duct work.
Installation of new plumbing fixtures, air handlers, sheet metal ductwork and controls package.
New Showroom & Plumbing Supply House
Installation of new underfloor chilled water piping, two Liebert units, twenty new CRAC units, rooftop Chiller…
Completed HVAC systems for building A and C in spring of 2018
New St. Johns County Health Department completed in spring of 2015
Completed installation of HVAC system in 2013
Completed installation of HVAC system in 2012
DC4 Expansión, New 400 ton chiller and piping
Replaced 19 Air Handling Units
Installation included fifteen Rooftop Units, six split systems, direct vehicle exhaust system and sheet metal duct work.
Brand new H-D Dealership and Retail store.
New Audi dealership completed in spring of 2017
New Toyota dealership completed in 2015
Completed installation in summer of 2011
Completed installation of HVAC systems in building 1001 and 1005 in 2015