The first new St. Johns County high school “HHH” in over 10 years!
Brand new St. Johns County K-8 school “MM” completed on time for 2020-21 academic year.
New two-story classroom building.
Campus-Wide HVAC upgrade; Re-piped entire underground chilled water loop of existing school, built brand new 500-ton cooling capacity CEP, replaced all duct work in 17 buildings and installed 10 new AHU.
Converted existing elementary school into a K-8; new two-story classroom addition, gymnasium and CEP.
Brand new St. Johns County K-8 school “LL” completed in time for 2018-19 academic year
Brand new St. Johns County elementary school “M” completed in time for 2017-18 academic year
Orange Park, FL; Cafeteria Expansion completed in summer 2013; re-pipe of underground chilled and heating hot water system completed in fall of 2018
“III” high school was nearly identical to Tocoi Creek High School. The second high school we have completed in as many years, this one serves the Beachside Community.
Scope included over 250 water-source heat pumps, two rooftop cooling towers, two rooftop energy recovery ventilators, two self contained water-cooled units, boiler, heat-exchanger, five split-coupled vertical in-line pumps, VFDs, multiple exhaust fans and VAVs, eight floors plus roof of sheet metal duct work and hydronic piping.
Installation of new chiller, pumps, air handling units, piping and sheet metal duct work
Dining Room expansion project
Greenfield industrial beef and pork processing; installed primary anhydrous ammonia system and secondary glycol refrigerant system including 52 evaporators.
Expansion of industrial refrigeration system
Hilliard Middle-Senior High School expansion complete in 2015, Yulee Middle School addition completed in 2012
Jacksonville, FL; Design-Build of HVAC system for Duval County Public School completed in 2009
Installation included nine packaged Rooftop AC units, six Heat Pump Split System DX AC Units and sheet metal duct work.
Installation of new plumbing fixtures, air handlers, sheet metal ductwork and controls package.
New Showroom & Plumbing Supply House
Installation of new underfloor chilled water piping, two Liebert units, twenty new CRAC units, rooftop Chiller…
Completed HVAC systems for building A and C in spring of 2018
New St. Johns County Health Department completed in spring of 2015
Completed installation of HVAC system in 2013
Completed installation of HVAC system in 2012
Replaced 19 Air Handling Units
Installation included fifteen Rooftop Units, six split systems, direct vehicle exhaust system and sheet metal duct work.
Brand new H-D Dealership and Retail store.
New Audi dealership completed in spring of 2017
New Toyota dealership completed in 2015
Completed installation in summer of 2011
Completed installation of HVAC systems in building 1001 and 1005 in 2015